At the request of the Central Bank, “AS Inshaat” carried out the construction of a reserve center in Sumgait based on a general contract.
The project, which started in March 2016, includes the construction of three floors, one basement, a boiler room, and transformer room, a pool with fire and drinking water, and security posts.
The project works were completed in March 2017.
The project, which started in March 2016, includes the construction of three floors, one basement, a boiler room, and transformer room, a pool with fire and drinking water, and security posts.
The project works were completed in March 2017.