At the request of the Central Bank, “AS Inshaat” carried out the construction of a reserve center in Sumgait based on a general contract.  
Technical specifications:
  • 3 storey and 1 basement administrative building, construction area 802.8m2
  • The total area of the building is -1996.5 m2
  • Construction -monalite reinforced concrete
  • Facade - ceramic and aluminum stained glass
  • Roof cover - soft roof cover
  • Supporting buildings: boiler room, transformer, fire and drinking water tanks, guard posts
The project works were completed in march, 2017.